What a rear, side, second-storey or above-garage addition costs in Maple, and what moves the number.
Rough budgets before HST. The real number comes after a site visit and drawings. Additions under about 400 sq ft cost more per square foot, and underpinning is priced separately.
The $300 to $500 per sq ft rough budget multiplied out, before HST, design and permit fees. HST at 13% goes on top.
Treat these as a starting point for a budget, not a quote. A small addition usually lands above these numbers per square foot.
Small additions cost more per square foot, because the foundation, roof tie-in and permit cost about the same at any size.
A full basement under the addition costs more than a crawl space or slab, and gives you more space.
Openings into the existing house need beams, and long spans can need steel or engineered lumber.
Plumbing, venting and finishes add more than bedrooms or a family room.
Some houses need a bigger furnace or a second zone to heat the new space.
Tight side yards, trees, slopes and a minor variance all add time and cost.

Start with a site visit. We look at the house, the lot and what you want to add.
Then come the design and permit drawings, quoted after the visit, and a detailed price once the design is done.
Book a site visit$300 to $500 per sq ft before HST as a rough budget, for a rear, side or second-storey addition.
No. Design and permit drawings are priced separately and quoted after the site visit.
No. The budgets on this page are before HST.
About $25,000 to $45,000 for a cantilevered bump-out and $45,000 to $75,000+ on a new foundation.
The foundation, roof tie-in, permit and design cost about the same whatever the size, so they take up more of a small budget.
No. Underpinning is priced separately.
A site visit shows what your lot allows and what an addition would involve.