What the City of Vaughan asks for with an addition permit in Maple, and when the heritage district or the conservation authority comes into it.
Yes. In Ontario, every addition needs a building permit, and the City of Vaughan issues them for Maple.
Not sure? Ask the City before you start. Electrical work is reported to the Electrical Safety Authority, not the municipality.
Most additions need these. The City can ask for more, such as a grading plan, depending on the lot.
The house and addition on the lot, with setbacks to every property line, lot coverage and the driveway.
Existing and new floor plans with rooms labelled, plus every side of the house as it will look.
Wall and floor build-ups, beams, lintels and any engineered parts like trusses or joists.
Heat loss and duct layout for the new space, sized to the addition.
The energy efficiency design summary the Building Code asks for on additions.
Schedule 1 from a registered designer, unless an architect or engineer stamped the drawings.
Check zoning and heritage first. It saves a round of comments.
Setbacks, height and lot coverage, and whether the house is in the heritage district.
Heritage review, conservation authority or Committee of Adjustment if the lot needs them.
Drawings and forms go to the City of Vaughan.
10 business days for a complete house application. Comments add time.
Nothing gets covered until the inspector passes it.

The older part of Maple is a heritage conservation district under the Ontario Heritage Act, with its own plan from 2007.
Yes. The City of Vaughan issues building permits for additions in Maple.
The district covers the older village core. The City's heritage staff can confirm your address.
No, but the design gets reviewed against the district plan, which can shape the size, roof and materials.
The Ontario Building Code gives the municipality 10 business days to review a complete application for a house. Comments and resubmissions add time.
Only if the lot is in the conservation authority's regulated area, usually near a ravine, creek or valley.
The Electrical Safety Authority, separate from the City's building permit.
A site visit shows what your lot allows and what an addition would involve.